21. What is the installed capacity of the Uri-II Hydroelectric Power Project in Jammu and Kashmir?
A) 240 MW
B) 360 MW
C) 480 MW
D) 600 MW
Answer: D) 600 MW
22. The Sardar Sarovar Dam is built across which river?
A) Yamuna
B) Godavari
C) Narmada
D) Mahanadi
Answer: C) Narmada
23. What is the installed capacity of the Lower Subansiri Hydroelectric Power Project in Arunachal Pradesh?
A) 600 MW
B) 1,200 MW
C) 2,000 MW
D) 3,000 MW
Answer: B) 1,200 MW
24. The Chamera Dam is built across which river?
A) Beas
B) Chenab
C) Jhelum
D) Indus
Answer: B) Chenab
25. Which hydroelectric project is located on the Satluj River in Himachal Pradesh?
A) Nathpa Jhakri Hydroelectric Project
B) Tehri Dam
C) Sardar Sarovar Dam
D) Srisailam Dam
Answer: A) Nathpa Jhakri Hydroelectric Project